IPC 2013 : E01B 5/14 : Rails for special parts of the track, e.g. for curves.

IPC2013 > E > E01 > E01B > E01B 5/00 > E01B 5/14[2] > Rails for special parts of the track, e.g. for curves.
Notes[t] E01 - E06: BUILDING
Notes[g] E01B 1/00 - E01B 26/00: Structure of the permanent way for railways or tramways
E SECTION E — FIXED CONSTRUCTIONS.
E01 CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES.
E01B PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS (derailing or rerailing blocks on track, track brakes or retarders B61K; removal of foreign matter from the permanent way, vegetation control, applying liquids E01H).
E01B 5/00 Rails; Guard rails (manufacture of rails B21B ); Distance-keeping means for them.
E01B 5/14 · · Rails for special parts of the track, e.g. for curves.

CIP2013: Invenciones publicadas en esta sección.

  1. 1.-

    TRAMO DE CURVA DE LA VIA.

    . Solicitante/s: BWG BUTZBACHER WEICHENBAU GESELLSCHAFT MBH & CO. KG. Inventor/es:

    LA INVENCION SE REFIERE A UNA PISTA CURVADA DE LONGITUD L, CUYOS RAILES SIGUEN UNA VIA CURVADA DE TAL FORMA QUE LAS SECCIONES EXTREMAS CON EL RADIO DE CAMBIO DE CURVATURA SE EXTIENDEN A PARTIR DEL RAIL PRINCIPAL Y EL RAIL DE RAMIFICACION DE FORMA RESPECTIVA, EMPEZANDO CON UN RADIO DE CURVATURA R (R -- INFINITO) Y TERMINANDO CON UN RADIO R CONSTANTE. LAS SECCIONES EXTREMAS DISCURREN DENTRO DE UNA SECCION INTERMEDIA DE RADIO R. PARA ESTANDARDIZAR LAS PISTAS CURVADAS DE FORMA INDEPENDIENTE DE SUS LONGITUDES, SE PROPONE QUE LA SECCION INTERMEDIA DEBA SER DE UNA LONGITUD IGUAL O DE FORMA APROXIMADAMENTE IGUAL QUE LAS CORRESPONDIENTES A CADA UNA DE LAS SECCIONES EXTREMAS.