IPC 2013 : E04B 2/68 : made by filling-up wall cavities (E04B 2/24, E04B 2/38, E04B 2/52 take precedence).

IPC2013 > E > E04 > E04B > E04B 2/00 > E04B 2/68[3] > made by filling-up wall cavities (E04B 2/24, E04B 2/38, E04B 2/52 take precedence).
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E04 BUILDING.
E04B GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of openings in walls, floors, or ceilings E06B 1/00).
E04B 2/00 Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls (connections for building structures in general E04B 1/38; insulation for building in general E04B 1/62; building elements of relatively thin form for parts of buildings E04C 2/00).
E04B 2/68 · · · made by filling-up wall cavities (E04B 2/24, E04B 2/38, E04B 2/52 take precedence).

CIP2013: Invenciones publicadas en esta sección.

  1. 1.-

    PERFECCIONAMIENTOS EN ELEMENTOS DE CONSTRUCCION PREFABRICADOS PARA LA CONSTRUCCION DE EDIFICIOS.

    . Solicitante/s: DANTE ZAULI, ING.

    Perfeccionamientos en elementos de construcción prefabricados para la construcción de edificios, constituidos por dos paneles reunidos dorso con dorso, estando previsto un vacío entre ello, caracterizados porque presentan en al menos una parte de su periferia sobre espesores que constituyen partes de encofrado para osamenta.

  2. 2.-

    PROCEDIMIENTO CONSTRUCTIVO PERFECCIONADO PARA LA REALIZACION DE UNIDADES DE CONSTRUCCION.

    . Solicitante/s: LEOPOLD COLARD.

    Resumen no disponible.

  3. 3.-

    UN METODO PARA LEVANTAR UN EDIFICIO.

    . Solicitante/s: FREDERICK CROOKS.

    Resumen no disponible.