IPC 2013 : E01H 5/02 : Hand implements (E01H 5/04, E01H 5/10, E01H 5/12 take precedence).

IPC2013 > E > E01 > E01H > E01H 5/00 > E01H 5/02[1] > Hand implements (E01H 5/04, E01H 5/10, E01H 5/12 take precedence).
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E01 CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES.
E01H STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; CLEANING LAND; DISPERSING FOG IN GENERAL (mowers convertible to apparatus for sweeping or cleaning lawns or other surfaces, e.g. to remove snow, or capable of sweeping or cleaning lawns or other surfaces A01D 42/06; cleaning in general B08B).
E01H 5/00 Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice (by applying de-icing agents E01H 10/00; obstruction removers on vehicles B60R 19/00; sand, gravel or salt spreaders E01C 19/20).
E01H 5/02 · Hand implements (E01H 5/04, E01H 5/10, E01H 5/12 take precedence).