IPC 2013 : E02B 7/10 : Gravity dams, i.e. those in which the weight of the structure prevents overturning.

IPC2013 > E > E02 > E02B > E02B 7/00 > E02B 7/10[4] > Gravity dams, i.e. those in which the weight of the structure prevents overturning.
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E02 HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING.
E02B HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F).
E02B 7/00 Barrages or weirs; Layout, construction, methods of, or devices for, making same (for protecting banks, coasts, or harbours E02B 3/04; sealings or joints E02B 3/16; handling building or like materials for hydraulic engineering E02D 15/00; foundations in general E02D 27/00).
E02B 7/10 · · · · Gravity dams, i.e. those in which the weight of the structure prevents overturning.

CIP2013: Invenciones publicadas en esta sección.

  1. 1.-

    Procedimiento para dimensionar y adecuar la red de drenaje de presas y azudes.Constituido por siete etapas en las que se ejecuta una red de piezometría, se dibujan sobre un gráfico las subpresiones, se efectúa la limpieza de los drenes existentes, y se realiza un nuevo gráfico con valores actualizados, estableciendo las zonas con subpresiones excesivas. Mediante sondeos en los que se realizan ensayos geofísicos, se determina la profundidad óptima de los nuevos drenes. Se ejecutan estos nuevos drenes, para reducir subpresiones a valores aceptables,...

  2. 2.-

    Procedimiento para el sellado de vías de agua y reparación de juntas y fisuración en presas y roca de cimentación sin necesidad de desembalsar y sin suspender la explotación.Constituido por un procedimiento para reparación y sellado de fisuras, despegue del contacto de cimentación y diaclasas de la roca en presas, mediante inyección a alta presión de polímeros, recuperando el monolitismo estructural y sellando vías de agua, sin desembalsar y manteniendo el servicio. Primeramente se levanta un plano de las...