IPC 2013 : E02D 19/14 : by freezing the soil (in connection with sinking shafts E21D 1/12).

IPC2013 > E > E02 > E02D > E02D 19/00 > E02D 19/14[3] > by freezing the soil (in connection with sinking shafts E21D 1/12).
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E02 HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING.
E02D FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B ); UNDERGROUND OR UNDERWATER STRUCTURES.
E02D 19/00 Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D 5/02).
E02D 19/14 · · · by freezing the soil (in connection with sinking shafts E21D 1/12).

CIP2013: Invenciones publicadas en esta sección.

  1. 1.-

    PROCEDIMIENTO PARA LA EXTRACCION DEL AGUA DE LAS MINAS, ESPECIALMENTE DE LAS MINAS DE CARBON

    . Solicitante/s: ROMERO ROMERO,JOSE.

    PROCEDIMIENTO Y DISPOSITIVO PARA RECUPERAR AGUA EN MINAS DE CARBON. COMPRENDE: A) ASPIRAR EL AGUA A CORTA ALTURA; B) TRANSFORMAR EL AGUA EN BLOQUES DE HIELO MEDIANTE DEPOSITOS AUXILIARES DE ENFRIAMIENTO Y MOLDES; C) DEPOSITAR A LOS CUBOS DE HIELO EN VAGONETAS ; Y D) ELEVAR LA VAGONETA MEDIANTE EL MONTACARGAS . CONSTA DE: MAQUINAS PRODUCTORAS DE FRIO MONTADAS CERCA DEL POZO DE EXTRACCION Y UN DEPOSITO AUXILIAR DOTADO CON MOLDES , UNA CONDUCCION ELEVADORA SUMERGIDA EN LA MASA DE AGUA Y CON TUBERIAS DEL MEDIO ENFRIADOR Y MONTADO EN UNA CAMARA.