IPC 2013 : E02B 7/04 : Dams across valleys.

IPC2013 > E > E02 > E02B > E02B 7/00 > E02B 7/04[2] > Dams across valleys.
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E02 HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING.
E02B HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F).
E02B 7/00 Barrages or weirs; Layout, construction, methods of, or devices for, making same (for protecting banks, coasts, or harbours E02B 3/04; sealings or joints E02B 3/16; handling building or like materials for hydraulic engineering E02D 15/00; foundations in general E02D 27/00).
E02B 7/04 · · Dams across valleys.

CIP2013: Invenciones publicadas en esta sección.

  1. 1.-

    PROCEDIMIENTO PARA LA FABRICACION DE DEPOSITOS, BALSAS Y CANALES POR MEDIO DE ELEMENTOS MODULARES

    . Solicitante/s: CERDA MUÑOZ,JUAN MARI CERDA MUÑOZ,JAIME.

    PROCEDIMIENTO DE FABRICACION, MEDIANTE ELEMENTOS MODULARES PREFABRICADOS, DE RECIPIENTES PARA LIQUIDOS. BASADO EN LA UTILIZACION DE UNOS MODULOS PREFABRICADOS EN FORMA DE "T" INVERTIDA, Y DISPUESTOS SEGUN EL PERIMETRO DEL RECIPIENTE A FABRICAR, DE MODO QUE LAS PAREDES DE LOS ELEMENTOS MODULARES QUEDEN ALINEADAS, CON SUS BORDES ADYACENTES APOYADOS ENTRE SI, INTERPONIENDO LAS GUARNICIONES DE ESTANQUEIDAD ENTRE LOS MISMOS Y APOYADOS EN TODA SU ALTURA Y ANCHURA DE LOS MODULOS, SUJETANDOSE MEDIANTE TIRANTES Y PROCEDIENDOSE AL VERTIDO DE LA LECHADA DE HORMIGON QUE CONTIENE UN EXPANSIVO PARA CUBRIR LA ARMADURA DISPUESTA EN EL FONDO DEL RECIPIENTE. USADO EN LA FABRICACION DE DEPOSITOS, BOLSAS Y CANALES.