IPC 2013 : E04H 7/24 : Constructions, with or without perforated walls, depending on the use of specified materials.

IPC2013 > E > E04 > E04H > E04H 7/00 > E04H 7/24[2] > Constructions, with or without perforated walls, depending on the use of specified materials.
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E04 BUILDING.
E04H BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D).
E04H 7/00 Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site (tower aspects E04H 12/00; storage aspects, e.g. floating roofs, sealing means, filling or discharging means B65D, B65G, F17B, F17C; foundations E02D 27/38).
E04H 7/24 · · Constructions, with or without perforated walls, depending on the use of specified materials.

CIP2013: Invenciones publicadas en esta sección.

  1. 1.-

    PERFECCIONAMIENTOS EN UN CONJUNTO DE ALMACENAMIENTO Y DE HOMOGENEIZACION DE PRODUCTOS PULVERULENTOS

    . Solicitante/s: SOCIETE DITE: FULLER COMPANY.

    PERFECCIONAMIENTOS EN UN CONJUNTO DE ALMACENAMIENTO Y DE HOMOGENEIZACION DE PRODUCTOS PULVERULENTOS.COMPRENDE: UNA LOSA DE SEPARACION ENTRE EL SILO Y LA CAMARA DE HOMOGENEIZACION, INCLUYENDO ORIFICIOS DE TRANSFERENCIA , COMPRENDIENDO EL FONDO DEL SILO, UN CONO DE PEQUEÑA PENDIENTE DOTADO CON PRIMEROS ELEMENTOS DE FLUIDIFICACION Y CON UNA CORONA DE SEGUNDOS ELEMENTOS DE FLUIDIFICACION; ORIFICIOS DE ALIMENTACION DE LA CAMARA DE HOMOGENEIZACION, ESTANDO DISPUESTA LA SALIDA DE LA CAMARA LATERALMENTE EN LA PARTE INFERIOR DE ESTA ULTIMA EN LA BASE DE UNA COLUMNA DE EXTRACCION (E); Y UNA SALIDA DE MATERIA.