IPC 2013 : E02D 5/62 : Compacting the soil at the footing or in a casing by forcing cement or like material through tubes.

IPC2013 > E > E02 > E02D > E02D 5/00 > E02D 5/62[2] > Compacting the soil at the footing or in a casing by forcing cement or like material through tubes.
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E02 HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING.
E02D FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B ); UNDERGROUND OR UNDERWATER STRUCTURES.
E02D 5/00 Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16).
E02D 5/62 · · Compacting the soil at the footing or in a casing by forcing cement or like material through tubes.

CIP2013: Invenciones publicadas en esta sección.

  1. 1.-

    CABEZAL DE BARRENA HELICOIDAL PARA INSTALACION DE PILOTES EN EL SUELO.

    . Solicitante/s: HARENINVEST. Inventor/es:

    SE PRESENTA UNA CABEZA TALADRADORA PARA EL DESPLAZAMIENTO DE TIERRA PARA CLAVAR PILOTES EN EL TERRENO, QUE COMPRENDE UNA PUNTA , UN CUERPO DE DESPLAZAMIENTO QUE TIENE AL MENOS UNA PARTE INFERIOR CUYO DIAMETRO DE NUCLEO SE INCREMENTA EN UNA DIRECCION QUE SE SEPARA DE DICHA PUNTA , Y AL MENOS UN REBORDE EN FORMA DE TORNILLO QUE SE EXTIENDE AL MENOS SOBRE DICHA PARTE DEL CUERPO DE DESPLAZAMIENTO . PARA OBTENER UN DESPLAZAMIENTO MAS EFICIENTE, LA INCLINACION DEL REBORDE EN FORMA DE TORNILLO SE INCREMENTA Y EL DIAMETRO DEL NUCLEO DEL CUERPO DE DESPLAZAMIENTO SE INCREMENTA PREFERIBLEMENTE DE FORMA DISCONTINUA POR MEDIO DE DIFERENTES INCLINACIONES DE TRANSICION.

  2. 2.-

    PIEZA BASE TUBULAR PARA CONSTRUIR PILARES DE HORMIGON.

    . Solicitante/s: VISCONTI, ROBERTO. Inventor/es:

    LA PIEZA BASE TUBULAR DE TIPO RECUPERABLE, COMPRENDE UN ORGANO DE CIERRE DESTINADO A PREVENIR QUE EL AGUA DEL CURSO DE AGUA NO ENTRE EN LA PIEZA BASE MIENTRAS LA PRIMERA ES SUMERGIDA EN LA TIERRA Y PARA POSIBILITAR EL REPARTO DEL HORMIGON DURANTE LA FASE DE RECUPERACION DE LA MISMA PIEZA BASE. DE ACUERDO CON LA INVENCION, DICHO ORGANO DE CIERRE SE INSTALA DENTRO DE LA PIEZA BASE TUBULAR A CIERTA DISTANCIA DE SU PARTE TERMINAL LIBRE, DE FORMA QUE SE CREA UN RECINTO CERRADO, QUE DURANTE LA ETAPA DE COLOCACION DE LA PIEZA BASE, SE LLENA DE TIERRA COMPACTA, QUE FORMA UN TAPON QUE SELLA EL ELEMENTO DE CIERRE CONTRA LA ENTRADA DE AGUA DEL CURSO DE AGUA.

  3. 3.-

    PROCEDIMIENTO PARA INTRODUCIR Y ANCLAR UNA ARMADURA EN EL SUELO Y DISPOSITIVO PARA LA REALIZACION DE DICHO PROCEDIMIENTO.

    . Solicitante/s: LOUIS,CLAUDE.

    PROCEDIMIENTO Y DISPOSITIVO PARA INTRODUCIR Y ANCLAR UNA ARMADURA EN EL SUELO. CONSISTE EN ENVIAR A PRESION LA LECHADA DE ANCLAJE LIQUIDA MEDIANTE UNA BOMBA , DONDE LA ENERGIA CINETICA DE LA LECHADA A LA SALIDA DEL CONDUCTO DE LA ARMADURA SEA SUFICIENTEMENTE ALTA PARA PROVOCAR UN CORTE HIDRAULICO DEL SUELO; Y GOLPEAR SOBRE EL CILINDRO CON UN MARTILLO DE EXCAVACION VIBRATORIO PARA EVITAR LA RECONSTITUCION DEL SUELO ENTRE DOS CHOQUES. EL DISPOSITIVO COMPRENDE: UN MARTILLO VIBRADOR MONTADO SOBRE UNA DESLIZADERA QUE INCLUYE UNA GUIA MOVIL Y OTRA FIJA . TIENE APLICACION EN LA CONSTRUCCION DE EDIFICACIONES.