IPC 2013 : E02D 5/16 : Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly.

IPC2013 > E > E02 > E02D > E02D 5/00 > E02D 5/16[2] > Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly.
Notes[t] E01 - E06: BUILDING
E SECTION E — FIXED CONSTRUCTIONS.
E02 HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING.
E02D FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B ); UNDERGROUND OR UNDERWATER STRUCTURES.
E02D 5/00 Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16).
E02D 5/16 · · Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly.